Contractor Compliance Alert
Week of November 17, 2026
Prepared for Harbor and Pratt Electric. Electrical and low voltage. Baltimore City and Baltimore County.
Act this week
Urgent: Lead-safe work on pre-1978 housing
If you will disturb paint in a Baltimore rental built before 1978, confirm the RRP certificate is current before the bid goes out. Same-day item. This is the only place red is used.
MHIC renewals due in December
Home-improvement licenses expiring next month should be renewed before the holiday counter closes. A bid on a lapsed license is a bid you may not be allowed to sign.
County energy form
Baltimore County residential permits filed after this week should use the current energy worksheet. Check the packet before you upload.
Opportunities for you
The longest section. Matched to the trades on file.
State notices from eMMA are on the Bid Board.
- B
Baltimore City DPW
Water meter vault rehabilitation, Highlandtown
Excavation, concrete, plumbing. About $180–240k. Due Dec 12.
Worth a lookEst. profit $22,000 to $48,000 (9-13%)Why this grade
Sample score. City work, a size a mid-size crew can bond, and more than one trade in the packet.
- C
Baltimore County Public Schools
Roof replacement, Woodlawn Elementary
Roofing and sheet metal. About $1.1 million. Pre-bid Dec 2. Prevailing wage.
Worth a lookEst. profit $80,000 to $140,000 (8-12%)Why this grade
Sample score. Large for a small roofing crew, with a mandatory pre-bid and prevailing wage.
- A
Private, Canton
Three-story rowhouse renovation needs subs
Electrical, HVAC, plaster. Residential. Start in January. GC is Harbor Lane Builders.
Strong fitEst. profit $6,000 to $14,000 (15-22%)Why this grade
Sample score. Electrical scope in the city, residential, and no bond called out in the note.
- D
HABC, Latrobe Homes
Elevator modernization
Elevator. DBE participation goal. Due Dec 18.
Probably skipValue not posted
Why this grade
Sample score. Elevator license. A poor fit for the electrical shop this sample is written for.
Compliance updates
Licensing, permits, code, forms, deadlines. This section is not trimmed.
- Baltimore City: local amendments to the 2021 I-Codes. Firestopping and existing-building notes are the parts most shops are missing.
- Trade permits: the City electrical, mechanical, and plumbing fee schedule for this quarter is attached in the real email. Do not estimate from last year’s receipt.
- Baltimore County sediment control: the checklist revision adds a photo of the stabilized entrance. The old form is being returned.
- Mechanical license renewal: the City wants the certificate of insurance with the City named as certificate holder. A generic COI is not enough.
